Fluxys LNG has 1 remaining SABR on sale form the month of August 2024 after the auction of 18 July 2024 at 10h.
The slot will be allocated on a first committed first served basis.
FluxSwiss is offering transportation capacities in the North-South direction in the routes Wallbach - Gries Pass and Oltingue - Gries Pass on a Firm basis for the Month of July 2020.
Available quantities are 690 MWh for the route Wallbach - Gries Pass and 300 MWh for the route Oltingue - Gries Pass.
FluxSwiss is offering transportation capacity in the North-South direction for a total of 600 MWh/h on a Firm basis for the Month of December 2018.
FluxSwiss is offering transportation capacities in the North-South direction in the routes Wallbach - Gries Pass and Oltingue - Gries Pass on a Firm basis for the Month of March 2021. To further amplify flexibility, FluxSwiss is also offering capacities in the South-North direction.
90 MWh/h transportation capacity available on a firm basis in the North-South direction.
1080 MWh/h transportation capacity available on a firm basis in the North-South direction.
FluxSwiss is offering transportation capacities in the North-South direction in the routes Wallbach - Gries Pass and Oltingue - Gries Pass on a Firm basis for the Month of August 2020.
Available quantities are 1710 MWh for the route Wallbach - Gries Pass and 300 MWh for the route Oltingue - Gries Pass.
FluxSwiss is offering transportation capacities in the North-South direction in the routes Wallbach - Gries Pass and Oltingue - Gries Pass on a Firm basis for the Month of April 2020.
Available quantities are 1.680 MWh for the route Wallbach - Gries Pass and 300 MWh for the route Oltingue - Gries Pass.
FluxSwiss is offering transportation capacity in the North-South direction for a total of 600 MWh/h on a Firm basis for the Month of February 2019.
FluxSwiss is offering transportation capacity in the North-South direction for a total of 600 MWh/h on a Firm basis for the Month of November 2018.
1290 MWh/h transportation capacity available on a firm basis in the North-South direction.
In addition to the information already published on 27th September 2017, 21st March 2018 and 6th June 2018 regarding the situation of the TENP-I pipeline (temporary capacity restriction), Fluxys TENP and OGE publish hereby the following update.
450 MWh/h transportation capacity available on a firm basis in the North-South direction.
FluxSwiss is offering transportation capacities in the North-South direction in the routes Wallbach - Gries Pass and Oltingue - Gries Pass on a Firm basis for the Month of May 2020.
Available quantities are 1.680 MWh for the route Wallbach - Gries Pass and 300 MWh for the route Oltingue - Gries Pass.
In the spirit of cooperation with adjacent Transmission System Operators, FluxSwiss intends to support the new tender for Load Flow Commitment 2020 announced by Terranets bw.
Information over the quarterly capacity offer at the cross-border interconnection points Exit VIP Germany-CH is communicated by German TSO.
990 MWh/h transportation capacity available on a firm basis in the North-South direction.
Antwerp@C, une initiative d’ Air Liquide, BASF, Borealis, ExxonMobil, INEOS, TotalEnergies, Fluxys et de l’Autorité portuaire d'Anvers, a pour ambition de soutenir les efforts des industries en vue de réduire jusqu’à 50 % les émissions de CO2 du port d'Anvers, en Belgique, à l’horizon 2030, par la création d'une infrastructure commune pour CO2. Avec le lancement des études d'ingénierie, le projet a franchi une nouvelle étape dans la réalisation d'opérations plus durables et à faible émission de carbone du port d'Anvers.
Avec ce soutien, Antwerp@C franchit une nouvelle étape et voit son ambition renforcée de réduire potentiellement de moitié les émissions de CO2 au sein du port d'ici 2030.
FluxSwiss and SwissAI have signed a collaboration agreement to explore the performance of AI in energy infrastructure modelling. The collaboration marks a first step towards AI-enabled system modelling for the energy transition.